My stash is rather epic. I'm trying to knit it down to a manageable level while maintaining a sense of the Cold Sheep philosophy.
Showing posts with label shawl. Show all posts
Showing posts with label shawl. Show all posts
Wednesday, 7 January 2009
Good Day today!
Today was a good knitting day - I finished the pink shawl, used another ball of yarn and cast on my dad's sock. These are his first pair so I'm hoping I've guessed the correct number of stitches. I'm going to go now, finish the increasing and make him try it on!
Monday, 5 January 2009
Happy New Year!
I know I'm a day or 5 late, but I took myself off to Donegal for the New Year with some knitting friends, and knitted.
I was slightly deluded as to what I could actually accomplish up there (I brought stuff to knit a jumper, shawl, socks and finish a baby cardigan) Needless to say, those 4 items were not completed. I did cast on the shawl and knit through 100g of Sirdar Blur which helps with the 100 ball knitdown challenge (there's a list on the side so I can keep track of what I've used) Unfortunately, the shawl wasn't necessary, at the top of the list or urgent. It was a distraction, a procrastination tool. I didn't want to seam the cardigan and I didn't want to do 14 inches of 2x2 rib over 230+ stitches.
I'll get the cardigan finished this week, same goes for the shawl (hopefully) The socks will be cast on and so will the jumper.... a few evil rows at a time, but it'll get done.
As for mysock club, I'm not starting that until the Trekking socks are done. So I suppose these socks are unofficially the first of the year (although they kicked my butt last year and should have been done then)
Off to get cracking on this shawl then!
I was slightly deluded as to what I could actually accomplish up there (I brought stuff to knit a jumper, shawl, socks and finish a baby cardigan) Needless to say, those 4 items were not completed. I did cast on the shawl and knit through 100g of Sirdar Blur which helps with the 100 ball knitdown challenge (there's a list on the side so I can keep track of what I've used) Unfortunately, the shawl wasn't necessary, at the top of the list or urgent. It was a distraction, a procrastination tool. I didn't want to seam the cardigan and I didn't want to do 14 inches of 2x2 rib over 230+ stitches.
I'll get the cardigan finished this week, same goes for the shawl (hopefully) The socks will be cast on and so will the jumper.... a few evil rows at a time, but it'll get done.
As for mysock club, I'm not starting that until the Trekking socks are done. So I suppose these socks are unofficially the first of the year (although they kicked my butt last year and should have been done then)
Off to get cracking on this shawl then!
Labels:
cardigans,
challenges,
poet jumper,
shawl,
socks,
trekking,
used
Subscribe to:
Posts (Atom)